2014-10-21 (Tu) tDCS Unit

Parts arrived from Mouser so everything was ready to assemble the first unit according to the instructions written previously. The instructions were followed and photos were taken, 84 total. Some steps were revised during the process. A list of steps to add and eliminate was made. Two steps should be eliminated and fours reps should be added from and to the manual. The photos were rotated and automatically adjusted for color. An animated image was created. The time stamps from the photos indicated it took two hours from the first photo to the last.

Animated image of steps taken in order

First finished unit

Workspace. Actually kind of a wreck

To do:
  • Add and eliminate steps
  • Take photo of Mouser parts
  • Replace placeholder images
  • Use test subject to assemble unit
  • Revise manual
  • Host workshop

Journal Page


The rest of the posts for this project have been arranged by date.

A list showing of all the final posts of COMPLETED projects.


This disclaimer must be intact and whole. This disclaimer must be included if a project is distributed.

All information in this blog, or linked by this blog, are not to be taken as advice or solicitation. Anyone attempting to replicate, in whole or in part, is responsible for the outcome and procedure. Any loss of functionality, money, property or similar, is the responsibility of those involved in the replication.

All digital communication regarding the email address 24hourengineer@gmail.com becomes the intellectual property of Brian McEvoy. Any information contained within these messages may be distributed or retained at the discretion of Brian McEvoy. Any email sent to this address, or any email account owned by Brian McEvoy, cannot be used to claim property or assets.

Comments to the blog may be utilized or erased at the discretion of the owner. No one posting may claim claim property or assets based on their post.

This blog, including pictures and text, is copyright to Brian McEvoy.

Comments